Stainless steel fire water pipe for an metro tunnel in Belgium
After long discussions and several quotes we were able to send our colleagues to Belgium for a metro tunnel construction to build a 10km long stainless steel fire water pipeline. The pipes are joined together with AWI welding. The weld inspection was done with RTG (x-ray). The total length of the job will be approximately 6 months.
We thank our Client for this job, and we wish successful work to our colleagues!
Kategória: